9.0 QUALITY ASSURANCE PROVISIONS
9.1 Equipment Calibration
All test equipment and inspection facilities used in the performance of any test shall be maintained in a
calibration system in accordance with ANSI Z-540 and ISO 9000.
9.2 Inspection Conditions
Unless otherwise specified herein, all inspections shall be performed under the following
ambient conditions:
a. Temperature: 25 +/- 5 deg C
b. Relative Humidity: 30% to 60%
c. Barometric Pressure: Local ambient
9.3 The sample size is listed for each test in section 9.7 Qualification Test Table.
9.4 Acceptance
9.4.1 Electrical and mechanical requirements placed on test samples as indicated in paragraphs 6.0
and 7.0 shall be established from test data using appropriate statistical techniques or shall otherwise
be customer specified, and all samples tested in accordance with this product specification shall meet
the stated requirements.
9.4.2 Failures attributed to equipment, test setup, or operator error shall not disqualify the product. If
product failure occurs, corrective action shall be taken and samples resubmitted for qualification.
9.5 Qualification Testing
Qualification testing shall be performed on sample units produced with equipment and procedures
normally used in production. The test sequences shall be as shown in the qualification test table.
9.6 Re-Qualification Testing
If any of the following conditions occur, the responsible product engineer shall initiate requalification
testing consisting of all applicable parts of the qualification test matrix.
a. A significant design change is made to the existing product which impacts the product form, fit or
function. Examples of significant changes shall include, but not be limited to, changes in the plating
material composition or thickness, contact force, contact surface geometry, insulator design, contact
base material, or contact lubrication requirements.
b. A significant change is made to the manufacturing process which impacts the product form, fit or
function.
c. A significant event occurs during production or end use requiring corrective action to be taken
relative to the product design or manufacturing process.