Installation Instructions and Notes
1. Place the insulator over the chassis as shown.
2. Place LPT80 or NLP65 power supply over the insulator as shown.
3. Align the 4x power supply to the chassis standoff.
4. Secure 4 pan head screws with washer provided with in kit as shown.
5. Place the cover over LPT80 or NLP65 power supply as shown.
6. Align the 4x cover to the U-bracket countersink holes.
7. Secure 4 countersink screws provided with in kit as shown.
8. Overall dimensions: 5.906 (150) x 3.858 (98) x 1.798 (44.4).
9. 9.Base plate has three sets of customer mountings:
a. Bottom mounting (4X) M3 inserts. Max. screw penetration 0.0787 (2mm)
b. Side mounting (2X) 4mm clear holes plus 2 keyways. (See keyway detail)
c. Side mounting (4X) M3 inserts. Max. screw penetration 0.236 (6mm)
10.Ensure insulator is correctly fitted in base under PCB to maintain safety creepage
and clearances.
11.Ensure base is firmly connected to supply earth via the earth stud marked
12.When using this enclosure, ensure that relevant safety standards (e.g. EN60950) are com-
plied with, in respect to creepage and clearance distances, and distances through insulation.
13.All dimensions are in inches (mm)
Rev. 08.31.07
LPX80 Enclosure
1 of 2
Embedded Power for
Business-Critical Continuity
LPX80
Enclosure
Installation Notes
LPX80 • Cover Enclosure Kit
LPX80 will fit the LPT8X and NLP65
power supplies.
Materials
1 Base
1 Cover
4 M 3X6mm pan head screws
with spring washer
4 M 3X6mm countersunk screws
1 M4 nut
1 M4 star washer
1 M4 spring washer
1 Plastic insulator sheet