A3
DIMENSIONS:
0 PLC
1 PLC
2 PLC
3 PLC
4 PLC
ANGLES
D D
C
B
A
C
B
A
432 1
OF
SCALE SHEET REV
NAME
SIZE CAGE CODE DRAWING NO
TOLERANCES UNLESS
OTHERWISE SPECIFIED:
DWN
CHK
APVD
MATERIAL FINISH
REVISIONS
P LTR DATE APVD
DWN
DESCRIPTION
ALL RIGHTS RESERVED.
RELEASED FOR PUBLICATION
CCOPYRIGHT
THIS DRAWING IS UNPUBLISHED.
PRODUCT SPEC
APPLICATION SPEC
WEIGHT
1470-19 (3/13)
RESTRICTED TO
THIS DRAWING IS A CONTROLLED DOCUMENT.
TE Connectivity
CONSTRUCTION
Conductor:
Construction: Stranded 7x0.16 mm copper tin plated
Cross-section: AWG 26 (0.14 mm²)
Insulation:
Material: PVC 105$C
Insulation thickness: nom. 0.23 mm
Minimum thickness: 0.178 mm
Diam.: 1.00 #0.05mm
PITCH: 1.27 #0.05 mm
Colour: Gray RAL7032, CONDUCTOR 1 RED
Shore hardness: (A) 94 #3
Electrical requirements:
Voltage proof: > 2 kV at 50 Hz eff about 1 minute
Conductor Resistance DC: max. 135 Ohm/km at 20$C
Insulation Resistance: min. 20 MOhm x km at 20$C
Max Operating Voltage: max. 300 V
Capacitance: max. 60 pf/m at 1 kHz
Mechanical Requirements
Temperature Range
fixed -30 +105$C (-40$C according DIN 72551)
moving -20 +105$C (-40$C according DIN 72551)
Certification: UL2651
CSA
flamenbility resistance according to UL VW-1/CSA FT-1
Remarks: Length per Reel has to be splice free
THE DRAWING SHOWS THE 2-DIMENSIONAL REFERENCE COMPONENT CONDITION
OF THE ASSEMBLY TO IDENTIFY AND SPECIFY THE NECESSARY DIMENSIONS ONLY.
THE DELIVERED PARTS MAY DEVIATE FROM THE DRAWING REGARDING THE ORIENTATION
AND POSITION OF EACH COMPONENT (e.g. SLACK CABLE), SO FAR THE FUNCTIONALITY
IS NOT CONCERNED.
DIE ZEICHNUNG ZEIGT DEN 2-DIMENSIONALEN IDEALZUSTAND DES ZUSAMMENBAUTEILS
BEZUEGLICH DER KOMPONENTEN ZUR IDENTIFIKATION UND SPEZIFIKATION DER NOTWENDIGEN
DIMENSIONEN. HINSICHTLICH DER ORIENTIERUNG UND DER LAGE DER KOMPONENTEN
(z.B. BIEGESCHLAFFES KABEL) KOENNEN DIE GELIEFERTEN TEILE VON DER ZEICHNUNG ABWEICHEN,
SOFERN DIE FUNKTIONALITAET NICHT BEEINTRAECHTIGT IST.
CUSTOMER DRAWING
956338
R.Nitschke
24OCT2003
G.Lindemann
24OCT2003
M.Folk 25OCT2003
10:1 1 1 A4
-
-
-
- -
mm
-
-
-
-
-
1$
RIBBON CABLE, AWG 26, 1.27 mm PITCH
RIBBON KABEL, AWG 26, 1.27 mm RASTER
-
-
2003
2003
00779
-
- -
A3 ADD NEW NUMBER OF POSITION
04MAY2011
TB IEG
A4 NOTE CHANGED
14SEP2015
OS MB
/KUNDENZEICHNUNG
/OBERFLAECHE/FARBE
MASSEINHEITEN:
AENDERUNGEN
FREI FUER VEROEFFENTLICHUNG
VERTRAULICHE UNVEROEFFENTLICHTE ZEICHNUNG
VON
MASSSTAB
BLATT
ZEICHNUNGS-NR.
ALLGEMEINTOLERANZEN
/WINKEL
BESCHREIBUNG
ALLE RECHTE VORBEHALTEN.
PRODUKTSPEZ.
VERARBEITUNGSSPEZ.
GEWICHT
NUR FUER
MATED WITH:
PASSEND ZU:
PROJEKT NR.:
-
-
DIMENSIONING AND TOLERANCING PER GPS (ISO STANDARDS).
C
0.23 #0.05
B
1.00 #0.05
TE PN REV. C (mm) TOL. B (mm) TOL. NUMBER OF
CONDUCTORS
956338-9 A11.16 10.16 9
1-956338-0 A 12.43 11.43 10
1-956338-4 A 17.51 16.51 14
2-956338-0 A 25.13 24.13 20
2-956338-5 A 31.48 30.48 25
2-956338-6 A 32.75 31.75 26
3-956338-4 A 42.91 41.91 34
5-956338-0 A 63.23 62.23 50
Note:
Material Certificate/Works Certificate/ISIR (Initial Sample Inspection Report)
The component supplier has the obligation to add to each parts delivery
a material certificate/a works certificate acc. to DIN 50049/EN 10204-3.1.B
comprising of the following points:
1- Components correspond to the company standard (e.g. BMW N600 14.0),
acc. to agreement.
2- Supplied component according data sheet No.: XXXXX
3- Component production date
4- Exact component description (e.g. Cable LiYY 2x0.5mm² tinplated)
5- Supplier's part number and TE PN with actual revision status
6- Quantity
7- Order number
Points 3) to 7) have to be attached per label to the largest packaging unit.
In addition, with the initial delivery the supplier has to add to the
material certificat a data sheet.
In case of product changes a data sheet has also to be added.
Furthermore the component supplier is obliged to send PPAP/Level 3 or ISIR/Level 2
documentation to the responsible engineering department at TE
The PPAP/Level 3 or ISIR/Level 2 documentation has to be provided prior to first serial delivery.
For every physical change of the product a supplementary PPAP/ISIR documentation
has to be provided (in accordance with responsible engineering department).
The supplier has to take care that the PPAP/ISIR documentation is up to date
and not older than one year.
For every physical change of the product delivered to TE a complete entry into the
IMDS database has to be realized.
This has to be confirmed against TE.
Bemerkung:
Materialzertifikat/Werksbescheinigung/EMPB (Erstmusterpruefbericht)
Der Komponenten-Zulieferer ist verpflichtet, jeder Teillieferung
ein Materialzertifikat/eine Werksbescheinigung gem. DIN 50049/EN 10204-3.1.B
unter Angabe folgender Punkte beizufuegen:
1- Komponente entspricht der Werksnorm X (z.B. BMW N600 14.0), je nach Vereinbarung
2- gelieferte Komponente nach Datenblatt-Nr.: XXXXX
3- Fertigungsdatum der Komponente
4- genaue Angabe der Komponente (z.B. Kabel LiYY 2x0.5mm² verz.)
5- Artikel-Nr. des Zulieferers und TE PN mit aktuellem Rev.-Stand
6- Menge
7- Auftragsnummer
Die Punkte 3) bis 7) sind per Etikett auf die jeweils
groesste Verpackungseinheit aufzubringen.
Zusaetzlich ist ein Datenblatt vom Zulieferer bei Erstlieferung bzw.
bei jeder Produktaenderung an das Materialzertifikat zu heften.
Des weiteren ist der Komponenten-Zulieferer verpflichtet,
vor der Erstlieferung eine Erstbemusterung gemaess PPAP/Level 3
oder EMPB/Vorlagestufe 2 an die zustaendige technische
Abteilung bei TE zu senden.
Bei jeder nachfolgenden physikalischen Aenderung am Produkt ist eine Nachbemusterung
(Umfang nach Absprache mit der zustaendigen technischen Abteilung) einzureichen.
Es ist darauf zu achten, dass die beigefügten Dokumente aktuell
und nicht aelter als ein Jahr sind.
Fuer jede an TE gelieferte Komponente muss ein
vollstaendiger Eintrag in die IMDS-Datenbank erfolgen.
Dies ist gegenueber TE zu bestaetigen.
A4