Honeywell VV, VP, VB & MS SERIES FOR VQ400M CLASS "A" VALVES PRODUCT HANDBOOK APPLICATION The VV Series class "A" vent valves are intended to be used in combination with the VQ400M series combination valve. The valves are supplied as a kit which enables the field mounting of the vent valve onto the VQ400M possible. The VP Series class "A" pilot valves are intended to be used in combination with the VQ400M series combination valve. The valves are supplied as a kit which enables the field mounting of the pilot valve onto the VQ400M possible. Figure 1: Vent Valve "right" The valves are available in two different basic versions: Figure 2: Vent Valve "left" 1: DN20 (3/4") Fast Opening 2: DN 20 (3/4") Slow Open version The VB Series class "A" by pass valves are intended to be used in combination with the VQ400M series combination valve. The valves are supplied as a kit which enables the field mounting of the by pass valve onto the VQ400M possible. The valves are available in two different basic versions: 1: DN20 (3/4") Fast Opening 2: DN 20 (3/4") Slow Open version Figure 3: Pilot Valve Figure 4: By Pass Valve The MS Series CPI switches are intended to be used in combination with the VQ400M series combination valve. The switches are supplied as a kit which enables the field mounting of the CPI switch onto the VQ400M possible Figure 5: CPI switch 1 EN2R-9082 0907RB1109RC Opening time: SPECIFICATIONS VV series: N.A. The Vent Valves are supplied with kit KTVQM002 containing: VB & VP series fast open: < 1 sec - Valve Q.ty: 1 VB & VP series slow open: Adjust.: 1 ...30 sec - Mounting screws M5 x 14 Q.ty: 4 - Mounting gasket Q.ty: 1 Closing time: Vent valve: <1 sec after energization The Pilot Valves are supplied with kit KTVQM002 containing: VP & VB series: <1 sec - Valve Q.ty: 1 Electrical connections - Mounting screws M5 x 14 Q.ty: 4 Plug connection according to PG11 - Mounting gasket Q.ty: 1 Three pin plug connector according to DIN EN 175301-803 or ISO 4400, see page 10 The Pilot Valves are supplied with kit KTVQM001 containing: Supply Voltages VV, VB & VP: - Valve Q.ty: 1 - Mounting screws M5 x 14 Q.ty: 4 115V 50/60 Hz - Mounting gasket Q.ty: 1 120V 50/60 Hz Line voltage: 230V 50/60 Hz Coils for rectified AC with rectifier in connection box The CPI switches are supplied in "ready to fit and use" state Maximum operating parameters MS: Models See for model overview: survey 50040301. Available through Honeywell sales representative. Voltage: 250 V Current: 3A Operational Voltage range Dimension Valves will function between 85% and 110% of the rated voltage. VV420: See drawing: INST0176 VP420: See drawing: INST0175 VB420: See drawing: INST0174 Enclosure VV, VB & VP: MS06: See drawing: INST0181 IP54 in combination with PG11 connection Available through Honeywell sales representative IP65 in combination with DIN-plug connection Ambient temperature range Enclosure MS: -15 ... 60 degrees C. IP65 Maximum operating pressure Coil Insulation solenoid valves : 360 mbar Insulation material specified according Class F Body material VV, VB & VP: Aluminum alloy die cast body MS: Nylon 2 EN2R-9082 0907RB1109RC Maximum working frequency VV420: VP & VB420 Fast Open: 30 cycles/min VP & VB420 Slow Open: 1 cycle/min MS: 30 cycles/min Closing spring AISI 302 steel SPECIFICATIONS cont. Seals and gaskets Hydro carbon resistant NBR rubber Hydro carbon resistant Cork-Nitril rubber Viton rubber Duty cycle Valves suitable for permanent energizing Designed life time 500000 cycles Power consumption Voltage Power [V] [W] BB020046 115 16,3 VV420 BB020046 120 17,8 BB020041 230 18,8 BB020046 115 16,3 VP420 BB020046 120 17,8 BB020100 230 14,8 BB020046 115 16,3 VB420 BB020046 120 17,8 BB020100 230 14,8 Table 1: Power consumption Gas valve Coil nr Current [mA] 156 160 92 156 160 72 156 160 72 Capacity: (m3/h air at dP=2.5mbar) VV420 on VQ400 series: Not applicable VP420 on VQ420/425: 5.1 See figure 6 VP420 on VQ440/450: 6.8 See figure 7 VB420 on VQ420/425: 4.2 See figure 6 VB420 on VQ440/450 6.1 See figure 7 3 EN2R-9082 0907RB1109RC Pilot valve capacity curves 1000 100 300 200 10 100 80 60 Pressure drop 50 40 30 20 10 1 8 6 5 4 3 [mbar] [kPa] 2 1 0.1 Air VQ420M/425M VQ440M/450M (dv=1) Methane (dv=0.64) 1 2 3 4 5 6 8 10 20 5 30 40 60 50 3 Flow [m /h] 80 100 100 200 500 300 500 1000 1000 Honeywell Figure 6: Capacity curve for Pilot valve mounted on main valve 4 EN2R-9082 0907RB1109RC By-pass valve capacity curves 1000 100 300 200 10 100 80 60 Pressure drop 50 40 30 20 10 1 8 6 5 4 3 [mbar] [kPa] 2 1 0.1 Air VQ420M/425M VQ440M/450M (dv=1) Methane (dv=0.64) 1 2 3 4 5 6 8 10 20 5 30 40 50 60 80 100 100 3 Flow [m /h] 200 500 300 500 1000 1000 Honeywell Figure 7: Capacity curve for Bypass valve mounted on main valve 5 EN2R-9082 0907RB1109RC MOUNTING INSTRUCTIONS VV420 on to VQ420/425M Guideline for how to mount VV420 Vent valve: See figure 8 9 & 10 1: Choose side of VQ400 where to mount valve 2: By looking in direction of gas flow a choice concerning left or right handed models can be made. 3: Remove plug P1 4: Put gasket 2 in place. Mounting holes in gasket match hole pattern on valve body. 5: Put valve in place. 6: Mount screws and fix VV420 to VQ400M by tightening screws clockwise with 5 Nm. Figure 8: VQ420/425M (vent valve mounted on right side) Tool bit to be used: TX25 7: Leak test to be carried out to ensure leak tight connection. WARNING * Its not allowed to remove and re-direct orientation of outlet flange of VV420 . Figure 9: VQ420/425M (vent valve mounted on left side) VV420 on to VQ440/450M Figure 10: VQ440/450M 6 EN2R-9082 0907RB1109RC MOUNTING INSTRUC. CONT. VP420 on to VQ420/425M Guideline for how to mount VP420 Vent valve: See figure 11 & 12 1: Choose side of VQ400 where to mount valve 2: Remove plug P1 3: Put gasket 2 in place. Mounting holes in gasket match hole pattern on valve body. 4: Put valve in place. 5: Mount screws and fix VP420 to VQ400M by tightening screws clockwise with 5 Nm. Tool bit to be used: TX25 6: If required, orientation of angled flange at bottom can be changed to required position. Fastening torque for flange screws after changing orientation flange: 5 Nm. Figure 11: VQ420/425M Tool bit to be used: Cross hatched screw driver. 7: Leak test to be carried out to ensure leak tight connections. VP420 on to VQ440/450M Figure 12: VQ440/450M 7 EN2R-9082 0907RB1109RC MOUNTING INSTRUC. CONT. VB420 on to VQ420/425M Guideline for how to mount VB420 Vent valve: See figure 13 & 14 1: Choose side of VQ400 where to mount valve 2: Remove plug P1 and P2 3: Put gasket 2 in place. Mounting holes in gasket match hole pattern on valve body. 4: Put valve in place. 5: Mount screws and fix VB420 to VQ400M by tightening screws clockwise with 5 Nm. Tool bit to be used: TX25 6: Leak test to be carried out to ensure leak tight connections. Figure 13: VQ420/425M VB420 on to VQ440/450M Figure 14: VQ440/450M 8 EN2R-9082 0907RB1109RC Guideline for how to mount MS06 CPI switch: MS062001/2501 on to VQ420/425M See figure 15,16 & 17 1: Choose valve to be detected 2: Remove plug P1 for first valve or P2 for second valve 3: Screw CPI switch to VQ400M clockwise tighten by 2,5 Nm. Be sure that terminals 1 and 2 in closed position. Tool to be used wrench 17 4: If sensing head tight can be turned CPI box to final position. 5: Leak test to be carried out to ensure leak tight connections. Figure 15: VQ420/425M (CPI mounted to detect V1 position) MS064001/5001 on to VQ420/425M Figure 16: VQ440/450M(CPI mounted to detect V2 position) Figure 17: VQ440/450M - detail 9 EN2R-9082 0907RB1109RC INSTALLATION WARNING IMPORTANT Tightness test after installation 1. Read these instructions carefully. Failure to follow the instructions could damage the product or cause a hazardous condition. * Spray all pipe connections and gaskets with a good quality gas leak detection spray. 2. Check the ratings given in the instructions and on the product to make sure the product is suitable for your application. * Start the appliance and check for bubbles. If a leak is found in a pipe connection, remake the joint. A gasket leak can usually be stopped by tightening the mounting screws, otherwise, replace the gas valve. 3. The installation has to be carried out by qualified personnel only. 4. Carry out a thorough checkout when installation is completed. * Electrical connection Disconnect power supply to the valve actuator before beginning the installation to prevent electrical shock and damage to the equipment. * Do not remove the seals and plugs from valves until ready for mounting. * Take care that dirt does not enter the gas valves during assembly/handling * Complete the electrical connections as instructed in the electrical connection section. WARNING * Switch off power supply before making electrical connections. * All wiring must comply with local codes, ordinances and regulations. Use lead wire which can withstand 105 C ambient. The electric ON/OFF operator is provided with a terminal block for electrical connections. Maintenance and service Wiring PG11- VV, VB & VP The designed lifetime* of this product is 10 years, based on date code, according to: a) the standard EN 126 b) the table on designed lifetime as stated on the Afecor website http://www.afecor.org/ Remove screws (A) Take off protective cover lids and gaskets (B) Take off plug Pg11 from hole which used for connection. Un-tighten cable support screw (C). We cannot assume that the product can be safely used beyond the mentioned designed lifetime. This lifetime is based on use of the control according manufacturer's instructions. Prepare cable * Remove plastic outside insulation for about 50 - 75 mm. * Strip wires from plastic insulation for about 5 - 7 mm. Regular inspection of the control by authorized personnel in accordance with guidelines of the appliance manufacturer is required. Place cable in cable support screw (C), steel ring (D), rubber ring (E) and guide wires through the hole in the cover to the connection block (DF). After reaching the designed lifetime the product has to be replaced by authorized personnel. Note: * Warranty as opposed to designed lifetime is described in the delivery terms. Connect wires between plates by tightening the particular screws (D1F1, D2F2, D3F3). * Left: Phase * Middle: Earth connection * Right: Neutral Mounting position The gas valves and CPI switches can only be mounted as shown in figures 8 to 17. Tighten cable support screw (C). Place gasket and cover lid in position (B) 10 EN2R-9082 0907RB1109RC Place screws (A) and tighten screws. Wiring DIN plug - MS Follow the instructions supplied by the appliance manufacturer as shown in the figures below. Figure 20: CPI - inside wiring (closed valve position) Figure 21: Connection base for four pins plug connector (according to ISO 4400 / DIN EN 175301-803) ADJUSTMENTS AND FINAL CHECKOUT Figure 18: Connection through PG11 bushing The procedures described in this chapter are related to the adjustments on the main gas valve, pilot valve and by-pass valve. For adjustments on the other additional functionalities (e.g. pressure switch), refer to the included instruction sheet of the product in question in the package. Wiring DIN plug Follow the instructions supplied by the appliance manufacturer as shown in the figures below. CAUTION * Adjustments must be made by qualified personnel only. * To ensure a safe closing of the valves, it is essential that voltage over the terminals of operators is reduced to 0 Volts. Figure 19: Three pin electrical plug connector (according to ISO 4400 / DIN EN 175301-803). 11 EN2R-9082 0907RB1109RC 1. Remove the cap from top of the coil by loosening both screws. VP & VB valves fast opening 2. Place a wrench on the adjustment hexagon nut. 3. Turn wrench counter-clockwise to increase or clockwise to decrease the flow rate. 4. Replace cap on top of the coil. Figure 22: Adjusting flow rate. Flow rate adjustment (see Fig. 22.) 1. Remove the cap screw from top of the coil. 2. Place a socket head wrench into the adjustment nut. 3. Turn wrench counter-clockwise to increase or clockwise to decrease flow rate. Figure 24: Adjusting flow rate. Step pressure adjustment (see fig. 25.) 4. Replace cap screw. 1. Remove the cap from top of the coil by loosening both screws. VP & VB valves slow opening 2. Place a screw driver in the slot of adjustment screw which is situated in center of the valve. The following characteristics can be adjusted: * flow rate * step pressure * opening speed 3. Turn screw driver counter-clockwise to increase or clockwise to decrease step pressure. 4. Replace cap on top of the coil. Figure 23: Characterized opening. Figure 25: Adjusting step pressure. IMPORTANT Opening speed adjustment 1. Remove the cap from top of the coil by loosening both screws. To ensure a satisfactory setting of the valve the pressure drop over the valve should be at least 10% of the supply pressure or 2.5 mbar which ever is the greatest. 2. Place screw driver in the slot of adjustment screw which is of center line. 3. Turn screw driver counter-clockwise to increase the opening speed and therefore the time till full opening will decrease. Flow rate adjustment 12 EN2R-9082 0907RB1109RC 4. Turn screw driver clockwise to decrease the opening speed and therefore the time till full opening will increase. 5. Replace cap on top of the coil. Figure 26: Adjusting opening speed. Final checkout of the installation Set the appliance in operation after any adjustment and observe several complete cycles to ensure that all burner components function correctly. CPI switch adjustment 1. Ensure that valve is in closed position (no coil energized) APPROVALS 2. Place a socket head wrench into the adjustment nut. The gas valve series VV, VP & VB and CPI switch 3. Turn adjustment screw clockwise till terminals 1 and 3 in closed position. series MS, to be used with VQ series of gas valves, have been designed to meet the European 4. Turn the adjustment screw an additional half turn clockwise to achieve some over travel at the switch. standards: * * 5. Operate valve several times to ensure proper functioning of the switch EN 161 EN 126 Automatic shut-off valves Multifunctional controls DECLARATION OF CONFORMITY Honeywell Technologies Sarl. Rolle, Switzerland, declares under it's sole responsibility that in combination with the VQ Modular Valve product family, the following valves: pilot valves VP, bypass valves VB, and vent valves VV Figure 24: CPI switch adjustment to which this statement relates, are: 13 EN2R-9082 0907RB1109RC * in conformity with the essential requirements of the Gas Appliance Directive 90/396/EEC based on EN 126:2004 * in conformity with the essential requirements of the Low Voltage Directive 2006/95/EC based on EN 60730-1:2000 * in conformity with the essential requirements of the EMC Directive2004/108/EC for immunity based on the standard: EN55014-2: 1997 (Immunity, Product Family Standard) for emission based on the standard: EN55014-1: 2006 (Emission , Product family standard) 14 EN2R-9082 0907RB1109RC CONSTRUCTION AND WORKING PRINCIPLES The VP and VB420 series gas valves are class "A" fail safe shut-off valves. The valve is opened by energizing the direct ON / OFF operator. The direct ON / OFF operator consists of a coil and stop sleeve assembly. Inside the top sleeve assembly a plunger is placed which is able to move up and down and thus opening or closing the valve. The plunger is gliding on two anti-friction bearings. Flow regulation is done by adjustable plunger stroke. Valve closing springs are made out of steel AISI 302. Seals and gaskets are manufactured out of hydrocarbon resistant NBR according to DIN 3535 and EN291 or made out of Viton The VV420 series gas valves are class "A" fail safe vent valves. The valve is closed by energizing the direct ON / OFF operator. The direct ON / OFF operator consists of a coil and stop sleeve assembly. Inside the top sleeve assembly a plunger is placed which is able to move up and down and thus opening or closing the valve. The plunger is gliding on two anti-friction bearings. Valve closing springs are made out of steel AISI 302. Seals and gaskets are manufactured out of hydrocarbon resistant NBR according to DIN 3535 and EN291 or made out of Viton The MS06 series CPI switches contain micro switches indicating the position of the valve. Closed position is detected by mechanical contact between valve and extension of the switch. If valve opens, the shaft is moved by spring and switch can change over. ORDERING INFORMATION Basic OS number structure for valves: VY420X1xxx VY= VV: Vent Valve VP: Pilot valve VB: Bypass valve 420: DN20 X: A: fast closing. Only for Vent valve series B: Fast Opening with throttle C: Slow open Basic OS number structure for CPI switches: MS06xx001 xx: 20: CPI switch suitable for VQ420M series 25: CPI switch suitable for VQ425M series 40: CPI switch suitable for VQ440M series 50: CPI switch suitable for VQ450M series Honeywell Manufactured for and on behalf of the Environmental and Combustion Controls Division of Honeywell Technologies Sarl, Z.A. La Piece 16, 1180 Rolle, Switzerland or its Authorized Representative: Automation and Control Solutions Combustion Controls Europe Honeywell BV Phileas Foggstraat 7 7821 AJ Emmen The Netherlands Tel.: +31 (-)591 695911 Fax: +31 (-) 591 695200 http://ecc.emea.honeywell.com/default.htm 15 EN2R-9082 0907RB1109RC